Road Work
The road contractor will be begin the Tar and Chip application today September 23, 2026. Please be advised that temporary road closures may occur during this work.Once the roads have been treated, we ask all drivers to reduce their speed to 5 MPH to prevent oil from splashing onto vehicles.Roads included in this paving project:
Potawatame Trail — from Old Stage Road to West Cherokee Trail
Nosirrah Road — from West Cherokee Trail to Minnisink Trail
Pautuxent Trail — full length
Blackfoot Trail — from Chippewa Trail to Tapuco Drive
Mattawa Trail — from Crow Lane to Chippewa Trail
Thank you in advance for your cooperation.

Comments